Should the township proceed with the full $9M Tassel Park redesign?
Cascade Township is redesigning Tassel Park on the Thornapple River with a $9M+ plan that includes a sunken plaza, splash pad, riverfront boardwalk, pavilion, pedestrian underpass under Cascade Road, and new parking. Funded by Downtown Development Authority bonds — not general township taxes. Phase 1 construction could start summer 2026.
Yes — the park is overdue for a major upgrade and DDA funding protects the general fund
No — scale back the project; the cost and tree removal concerns outweigh the benefits
What people are saying for and against
The current Tassel Park playground equipment is from 2001 and fails current ADA compliance standards.
The current Tassel Park playground equipment is from 2001 and fails current ADA compliance standards. The covered pavilion leaks and the drainage at the softball diamond floods after any significant rain. The DDA funding mechanism means this gets built without touching the township general fund. I've been to the three design meetings — the community input was real, not performative. This is what parks funding is for.
Tassel Park draws families from Gaines Township, Caledonia, and unincorporated areas because the township maintains it at a high standard.
Tassel Park draws families from Gaines Township, Caledonia, and unincorporated areas because the township maintains it at a high standard. A $9M investment over a 25-year useful life is $360K per year — comparable to what neighboring communities spend on parks per resident. The alternative is deferred maintenance that turns into a $15M project in 2035 when the equipment becomes a liability and the pavilion fails completely.
My daughter uses the accessible swing — the only one in a 4-mile radius. The current accessible features at Tassel Park are minimal and aging.
My daughter uses the accessible swing — the only one in a 4-mile radius. The current accessible features at Tassel Park are minimal and aging. The redesign includes a fully accessible playground zone, paved pathways to all features, and a sensory garden. For families with kids with mobility or sensory needs, this isn't an amenity upgrade — it's a question of whether public space is actually public for everyone.
Sixty-seven mature trees are on the removal list in the current plan. I walk Tassel Park three times a week.
Sixty-seven mature trees are on the removal list in the current plan. I walk Tassel Park three times a week. Those trees are the park — the shade, the wildlife habitat, the stormwater absorption. The design team's aesthetic choices (the splashpad, the "natural play" features) can be achieved without felling 67 trees. I'm not anti-park. I'm anti-clear-cutting a mature urban forest to build a splashpad.
The DDA funding mechanism is presented as "free money" for the general fund but that's not accurate.
The DDA funding mechanism is presented as "free money" for the general fund but that's not accurate. DDA tax increment financing redirects property tax growth that would otherwise fund schools and county services. Cascade Township is essentially using school district future revenues to fund a park redesign. The parents cheering for this project should understand where the $9M is actually coming from.
The $9M estimate was produced before the cost of the drainage and stormwater management components was finalized.
The $9M estimate was produced before the cost of the drainage and stormwater management components was finalized. The last two major Kent County parks projects came in 22-31% over initial estimates. I want to see the full engineering cost breakdown, not the design rendering, before the township commits to this scope. Scale it back to $5-6M, remove the splashpad (highest-cost, shortest-useful-life feature), preserve more trees, and build the rest.